Provided Phase III construction engineering services for the removal and reconstruction of the Forest Glen Bridge over the North Branch of the Chicago River.

The services consisted of the complete removal of the existing single-span bridge (Structure No. 016-6161) and replacement with twin precast arch culverts, each spanning 42 feet. The limits of work were approximately from Station 8+3.00 to Station 11+65.00. Also included was drainage, paving, excavation, lighting and restoration as detailed in the construction documents.

Do you have a similar project?

Contact us to learn more

At Wynndalco we’re dedicated to serving you. After all, the way we treat our customers is what matters most. So, reach out, we’re waiting to serve.

 

Client: Chicago Department of Transportation
Location: Forest Glen, Illinois USA
Services Provided: Phase III Construction Management